Skip to main content
All Posts By

charleselena

Case Studies

Food Wholesaler – Mains Upgrade

Our client engaged our services to arrange for an increased electricity supply to cope with a number of new cool rooms which they were having installed. Our brief was simple, “…we need these cool rooms….so what do we need in terms of electricity to run them?” Several new cool rooms…
charleselena
July 23, 2015
Case Studies

Commercial Building Fire Damage

At 4pm one afternoon we received a harried call from the property manager of one of our commercial client’s properties – the building had had an electrical fire…… Notwithstanding that we were on the other side of Melbourne, we were mobile moments after receiving the call and were on site…
charleselena
July 23, 2015
Case Studies

National Network – Technology Rollout

At short notice, we were asked to install touchscreen roster kiosks and vein scanners across a national network for one of our corporate clients. Logistically this was an incredible challenge, as there were 23 sites across 3 states of Australia – all to be completed in less than 30 days.…
charleselena
July 23, 2015
Case Studies

Aged Care – Power Outage

Our client was as a corporate in the aged care sector which strived to provide the highest level of care to their residents. So when a severe storm brought down power lines and resulted in the loss of power to a facility – restoring operational functionality was critical. Upon being…
charleselena
July 23, 2015
Case Studies

Electrical Thermal Imaging

Thermal Image Camera’s (TIC) literally see through walls, they see in the dark and even take photos for lasting reference. TIC’s don’t however measure temperate as many believe, but rather they measure the amount of radiated thermal energy which comes from an item. The level of energy is then used…
charleselena
July 16, 2015